Skip to main content

02 — Yacht Al Makher

Main Switchboard Design & Programming

Motor yacht moored alongside a quay
Illustrative image
Asset
Yacht Al Makher
Departments involved
Electrical

Full design, manufacturing, installation and PLC programming of the main electrical switchboard and power distribution system.

Illustrative photograph — not taken on this project.

Scope of work

  • Switchboard design
  • Manufacturing
  • Installation
  • PLC programming
  • Power distribution system
Muscat harbour at dusk with the Hajar mountains behind

Have a vessel, plant or system that needs attention?

Tell us about the asset, the problem and the timeline. Our engineering team will come back to you with a clear plan.