03 — Fast Patrol Boat Haras 1
Central HVAC System Replacement

- Asset
- Fast Patrol Boat Haras 1
- Departments involved
- HVAC Systems
Complete removal and replacement of the central air-conditioning system, including chillers, air handling units, ductwork and control systems.
Illustrative photograph — not taken on this project.
Scope of work
- Chillers
- Air handling units
- Ductwork
- Control systems

Have a vessel, plant or system that needs attention?
Tell us about the asset, the problem and the timeline. Our engineering team will come back to you with a clear plan.




